TaHaZouka Park Improvements
TaHaZouka Park was connected to the City's main water system in July
2008. Only the Elkhorn and Woodland Cabin's water remains on
the existing well water system. A new water line was bored
under Highway 81 to connect TaHa's pump house to the City's water
main in front of Cubbys Truck Stop.

We have continued to improve our recreational facilities
throughout the winter season, working through the frost, ice and
snow. We think you will be impressed with the changes and
additions we have made at TaHaZouka Park.
Major upgrades have been made to the TaHaZouka Park.
The Youth Balfield Complex project is now completed. Concrete
walkways and bleacher pads have been poured. The bleachers
(both baseball and softball) all have shade structures over them. A
playground has been installed with a shade structure over it.
A colored, crumb rubber poured-in-place safety surfacing has been
installed on the concrete pad under the play equipment which will be
a first for our park system.

Another new playsystem has been installed near the main entrance to TaHaZouka
Park. It is installed on a concrete pad and with a colored,
crumb rubber poured-in-place safety surfacing that was installed on
April 27th. All the benches have been added. The Infinity Web
play structure was added to the playground on April 17th. This
is the first of its kind in Nebraska. This playground has been
opened to the public and has been well received and proving to be a
very popular place already. The last piece that was installed on May
27, which finished off this playground project, is a NEOS 360
interactive, electronic game which is a first for Nebraska also.
A security light was added to the playground for added security.

|